Revetment Works at K.Gulhifalhu
Period :
11th August 2020 – 14th March 2021
Client :
Boskalis Westminster Contracting Limited
Location :
Republic of Maldives
Rock revetment types & Lengths :
– Rock Revetment Type-C total length 320m1
– Rock Revetment Type-D total length 1,001m1
– Temporary Geo-Bag Revetment Type-E total length 1132m1
– Geo-Bags quantity: 5,660 pcs
Description :
Shore protection of the phase 1 and part of phase 2 was completed with Eco- friendly geotextile bags and the length of the revetment is 2.4 km, which is the longest Eco- friendly geotextile revetment in the Republic of Maldives.
His Excellency Mohamed Nasheed former President of the Maldives, Former Minister Ministry of Housing, Transport and Environment Mohamed Aslam and the Government delegation visited and inspected the construction site several times.